首页 | 本学科首页   官方微博 | 高级检索  
     检索      

武汉军山长江公路大桥B标主桥钢箱梁安装及斜拉索张挂施工
引用本文:刘齐辉,罗成斌.武汉军山长江公路大桥B标主桥钢箱梁安装及斜拉索张挂施工[J].中国港湾建设,2005(6):48-52.
作者姓名:刘齐辉  罗成斌
作者单位:第二航务工程局,湖北,武汉,430014
摘    要:文章主要介绍了武汉军山长江公路大桥B标主桥钢箱梁安装及斜拉索张挂的施工过程及方法,同时对主桥的施工监控进行了叙述。

关 键 词:钢箱梁  斜拉索  安装  合龙  监控
文章编号:1003-3688(2005)06-0048-05
收稿时间:2005-04-21
修稿时间:2005年4月21日

Installation of Steel Box Girders and Cable-Stays for Main Bridge for Contract B of Junshan Highway Bridge over Changjiang River in Wuhan
LIU Qi-hui,LUO Cheng-bin.Installation of Steel Box Girders and Cable-Stays for Main Bridge for Contract B of Junshan Highway Bridge over Changjiang River in Wuhan[J].China Harbour Engineering,2005(6):48-52.
Authors:LIU Qi-hui  LUO Cheng-bin
Institution:Whuhan Port Const. Corp. , Wuhan 430014, China
Abstract:The methods and process of installation of the steel box girders and cable stays for the main bridge for Contract B of Junshan Highway Bridge over the Changjiang River in Wuhan are mainly described in the paper. In the meantime, the monitoring and control of the construction of the main bridge are also described.
Keywords:steel box girder  cable stay  installation  closure  monitoring and control
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号