索道吊装技术在悬索桥施工中的应用 |
| |
引用本文: | 包立新,喻远良,林惠瑜. 索道吊装技术在悬索桥施工中的应用[J]. 重庆交通大学学报(自然科学版), 2001, 20(3): 4-6,27 |
| |
作者姓名: | 包立新 喻远良 林惠瑜 |
| |
作者单位: | 重庆交通学院 桥梁及结构工程系, |
| |
摘 要: | 分析了悬索桥架设主梁的施工索道 ,指出了它的特殊性 .并运用两种算法分析了悬索桥索道的布设及验算 ,对精细算法进行了理论推导 .通过对重庆鹅公岩长江大桥施工索道的实例分析得出了一些有益的结论
|
关 键 词: | 悬索桥 施工 索道 非线性 |
文章编号: | 1001-716X(2001)03-0004-03 |
修稿时间: | 2001-02-21 |
Installation technology of ropeway in suspension bridges construction application |
| |
Abstract: | In this paper, ropeway technology has been studied, which is beam installation about suspension bridges. Two methods have been applied in analysis on the ropeway disposition and checking of suspension bridges. A fine arithmetic method is derived from theory. The example points out some significative conclusions, which is about Chongqing egongyan changjiang river bridge. |
| |
Keywords: | suspension bridge construction ropeway nonliearity |
本文献已被 万方数据 等数据库收录! |
|