北京地铁5号线崇东区间渡线隧道穿越密集民房超前预加固地层施工方案探讨
引用本文:赵玉良.北京地铁5号线崇东区间渡线隧道穿越密集民房超前预加固地层施工方案探讨[J].铁道标准设计通讯,2003(12):22-24.
作者姓名:赵玉良
作者单位:赵玉良(中铁隧道集团北京指挥部,北京,100022)
摘    要:北京地铁 5号线崇 (文门 )—东 (单 )区间渡线大断面全段穿越明清密集民房区 ,为确定合适的超前预加固措施 ,有效控制沉降 ,分别对水平旋喷和大管棚方案进行计算和分析 ,并从工期和经济方面进行对比 ,为决策提供参考

关 键 词:地铁  大断面  水平旋喷  超前大管棚
文章编号:1004-2954(2003)12-0022-03
修稿时间:2003年9月25日

Advance Pre-strengthening of Ground for Crossover Tunnel Going Through underDense Dwelling Houses
Abstract:The crossover of Chongwenmen-Dongdan section of Beijing Metro Line 5 goes through dense dwelling houses. To determine appropriate advance pre-strengthening measure and effectively control ground settlement, computation and analysis was made of horizontal chemical churning pile and large pipe roof, and comparison was made between the two schemes with respect to construction period and economy.
Keywords:metro  large cross section  horizontal chemical churning pile  advance large pipe roof