首页 | 本学科首页   官方微博 | 高级检索  
     

梅东浅滩围垦对水流影响的数值模拟
引用本文:杨春平,姜大荣,徐 锟,孙平锋. 梅东浅滩围垦对水流影响的数值模拟[J]. 水运工程, 2013, 0(10): 12-18
作者姓名:杨春平  姜大荣  徐 锟  孙平锋
作者单位:中交第三航务工程勘察设计院有限公司,上海 200032;中交第三航务工程勘察设计院有限公司,上海 200032;中交第三航务工程勘察设计院有限公司,上海 200032;中交第三航务工程勘察设计院有限公司,上海 200032
摘    要:由于梅山本岛土地资源紧张,为了实现梅山规划区块功能,初步考虑在梅山本岛东部围垦以建设梅山通用航空产业基地等基础设施。采用MIKE 21 HD水动力模型对梅山水道封堵前提下5个不同围垦方案实施后对梅山岛海域的流场情况进行了数值模拟,并对比围垦实施前后潮流场变化情况,对各方案进行初步比选。从模拟结果可以看出,规划梅东围垦工程的建设不会改变大范围整体海域的流场结构。总体而言,梅东围垦方案一围垦范围最小,受其影响的范围也相对较小,而方案5由于未封堵扑蛇山与梅山间汊道,因此其对穿山南作业区的影响程度要小于其他各封堵汊道的方案。

关 键 词:梅山围垦;MIKE 21 HD水动力模型;水流影响;数值模拟

Numerical modeling of influence on current due to reclamation in Meishan
YANG Chun-ping,JIANG Da-rong,XU Kun and SUN Ping-feng. Numerical modeling of influence on current due to reclamation in Meishan[J]. Port & Waterway Engineering, 2013, 0(10): 12-18
Authors:YANG Chun-ping  JIANG Da-rong  XU Kun  SUN Ping-feng
Affiliation:CCCC Third Harbor Consultants Co., Ltd., Shanghai 200032, China;CCCC Third Harbor Consultants Co., Ltd., Shanghai 200032, China;CCCC Third Harbor Consultants Co., Ltd., Shanghai 200032, China;CCCC Third Harbor Consultants Co., Ltd., Shanghai 200032, China
Abstract:Due to the absence of the ground resource, the construction land of the general aerial industry baseis planned to get from reclamation in the east of Meishan to construct infrastructures in order to satisfy the functionsplanning of Meishan. We use the MIKE 21 HD model to simulate the influence on current due to the planned fivedifferent reclamation scenarios in the east of Meishan after plugging the Meishan waterway, and make a comparisonaccording to the modeling results. The modeling results reveal that the influence of the planned reclamationproject to the larger area tide field is little. Generally speaking, the influence of the first scenario is the least as itsreclamation area is the least among the five scenarios. While the fifth scenario has the least influence on the southChuanshan operation area, as the waterway between Pusheshan mountain and Meishan is not plugged.
Keywords:reclamation in Meishan   MIKE 21 HD model   influence on current   numerical modeling
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号