首页 | 本学科首页   官方微博 | 高级检索  
     检索      

新旧公路工程定额路基工程章节的差异
引用本文:张波,Yu Hongtai.新旧公路工程定额路基工程章节的差异[J].铁路工程造价管理,2008,23(4):32-35.
作者姓名:张波  Yu Hongtai
作者单位:新疆正大公路工程造价咨询公司,新疆,乌鲁木齐,830000
摘    要:新旧公路工程定额在定额项目(子目)、运输规定、损耗规定、工效水平、土石方计算、施工机械、定额编排等方面发生了较大变化。此文对路基工程章节进行了较为详细的对比,旨在提醒定额使用者在使用新定额时应从对旧定额的理解中解脱出来,合理使用新定额。

关 键 词:公路工程  新定额  旧定额  路基工程  差异

Difference of engineering quota of new and old highway in the chapter of subgrade works
Zhang Bo,Yu Hongtai.Difference of engineering quota of new and old highway in the chapter of subgrade works[J].Railway Engineering Cost Management,2008,23(4):32-35.
Authors:Zhang Bo  Yu Hongtai
Abstract:Of the engineering quota of new and old highway,greater changes have taken place in respect of quota items(specific items),transport regulations,consumption regulations,work efficiency level,computation of earth/rock work,constructional plant and quota layout.This article makes a detailed comparison between the new and the old in the chapter of subgrade works with a view to reminding quota users to free themselves from the comprehension of the old quota when using the new one so as to apply the new quota reasonably.
Keywords:Highway engineering  new quota  old quota  subgrade  difference
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号