首页 | 本学科首页   官方微博 | 高级检索  
     

���мƻ�Լ���µĶ�̬�ɴ��Է��������
引用本文:郭建媛,贾利民,秦勇. ���мƻ�Լ���µĶ�̬�ɴ��Է��������[J]. 交通运输系统工程与信息, 2015, 15(1): 118-122
作者姓名:郭建媛  贾利民  秦勇
作者单位:??????????a. ???????????b.??????????????????????????????100044
基金项目:国家“十二五”科技支撑计划课题
摘    要:在城市轨道交通中,随着各条线路的末班车按运行计划逐站完成载客任务,路网上OD两点间的可达路径逐渐变少,直至两点间不可达,这样的路网服务能力随时间的动态变化,称为动态可达性。本文研究运行计划约束下的路网动态可达性计算方法,以支持末班车开行的优化,实现搭乘末班车出行乘客目的地可达的最大化。本文首先分析了末班车开行带来的动态可达性,给出了最晚可达时间、路径可达性、OD可达性定义。在此基础上,提出了末班车开行下路网可达性的计算方法与最晚可达时间求解的递归算法。最后,以路网可达性最大为目标,将可达性计算方法应用于末班车换乘衔接优化。通过算例分析验证了可达性计算方法的有效性。

关 键 词:???н??  ?????  ?ν????  ???й?????  ???  
收稿时间:2014-09-03

Analyzing and Computing Dynamic Accessibility with Constraints of Schedule
GUO Jian-yuan,JIA Li-min,QIN Yong. Analyzing and Computing Dynamic Accessibility with Constraints of Schedule[J]. Journal of Transportation Systems Engineering and Information Technology, 2015, 15(1): 118-122
Authors:GUO Jian-yuan  JIA Li-min  QIN Yong
Affiliation:a. School of Traffic and Transportation; b. State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, China
Abstract:When time close to the running of last trains, the number of active routes in urban rail transit will become less and less. The network accessibility changing along with the time is called dynamic accessibility. The method about computing dynamic accessibility is studied, which fits to the planning of last trains and improves the service quantity to passengers who want to take very late or even last trains to their destinations. These definitions are given, such as latest accessible time, route accessibility and OD accessibility. Then, the main steps to compute network accessibility with last trains running is presented, and a recursive algorithm is used to compute the latest accessible time. At last, a flow of applying network accessibility is proposed to optimize the connection scheme of last trains. The example is given to demonstrate the feasibility of the method.
Keywords:urban traffic  accessibility  connection scheme  urban rail transit  last train
本文献已被 万方数据 等数据库收录!
点击此处可从《交通运输系统工程与信息》浏览原始摘要信息
点击此处可从《交通运输系统工程与信息》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号