首页 | 本学科首页   官方微博 | 高级检索  
     检索      

国际展览馆中变压器互为备供的研究与探讨
引用本文:于建杰.国际展览馆中变压器互为备供的研究与探讨[J].铁道建筑技术,2011(7):127-130.
作者姓名:于建杰
作者单位:中铁十八局集团公司科研设计院 天津300222
摘    要:根据一二级负荷的供电要求,阐述了变压器互为备供的方式和和要求,说明了一、二级负荷占比与变压器负荷率的关系,并用工程设计实例介绍了变压器不能经济运行时,利用空调专用变压器作为重要负荷备供的方法和操作流程。

关 键 词:变压器  备供  负荷率  经济运行

Research of the Mutual Backup of Transformer in International Exhibition Hall
Yu Jianjie.Research of the Mutual Backup of Transformer in International Exhibition Hall[J].Railway Construction Technology,2011(7):127-130.
Authors:Yu Jianjie
Institution:Yu Jianjie(China Railway 18th Bureau Group Co.Ltd.,Tianjin 300222,China)
Abstract:Based on the requirement of power supply of first and second load,the mode and requirement of mutual backup transformer is explained,the relation between the first and second class load ration is introduced and the methods and operation procedure for air conditioner-transformed transformer when the transformer can not work in a economic way is presented with engineering examples.
Keywords:transformer  backup  load ration  economic operation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号