首页 | 本学科首页   官方微博 | 高级检索  
     检索      

华能沙尔湖至哈罗铁路哈密地区接轨方案探讨
引用本文:刘维祥.华能沙尔湖至哈罗铁路哈密地区接轨方案探讨[J].铁道建筑技术,2013(10):21-23.
作者姓名:刘维祥
作者单位:中铁第五勘察设计院集团有限公司,北京102600
摘    要:华能沙尔湖至哈罗铁路主要为华能公司、葛洲坝公司、潞新公司规划的电厂用煤需求和矿区煤炭外运服务,也是规划建设的鄯善至烟墩铁路通道的组成部分,在路网及带动地方经济发展中将发挥非常重要的作用,研究年度运量较大.结合对社会及经济效益的影响,探讨其在哈密地区接轨方案的选择.

关 键 词:铁路  接轨点  线路方案  比选

Discussion of Junction Schemes for Special Railway of Huaneng in Hami Area
Liu Weixiang.Discussion of Junction Schemes for Special Railway of Huaneng in Hami Area[J].Railway Construction Technology,2013(10):21-23.
Authors:Liu Weixiang
Institution:Liu Weixiang (China Railway Fifth Survey and Design Institute Group Co. Ltd. , Beijing 102600, China)
Abstract:Special railway of Huaneng is mainly for planning power plant' s coal demand and coal mine' s external transport of Huaneng, Gezhouba and Luxin,whieh is also an important part of the planning Shanshan to Yandun railway. It will play a significant role in the railway network and local economic development,with its large annual transportation volume. Selec- tion of jnnetion schemes will be discussed in view of its impact on the economic and social benefits in Hami area.
Keywords:railway  junction station  line scheme  alternatives comparison
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号