东海大桥高桩承台整体钢套箱安装
引用本文:宋长兵,周先念. 东海大桥高桩承台整体钢套箱安装[J]. 桥梁建设, 2006, 0(Z1): 66-67
作者姓名:宋长兵  周先念
作者单位:1. 中铁大桥局集团桥科院有限公司,湖北,武汉,430034
2. 路桥华东工程有限公司,上海,200135
摘    要:东海大桥海上施工环境恶劣,安全风险大,海上套箱安装时必须把握好潮汐、风、浪等自然规律,合理组织,有效控制套箱安装时间,降低海上施工的安全风险。

关 键 词:高桩承台  整体式  套箱  安装
文章编号:1003-4722(2006)S1-0066-02
修稿时间:2005-10-11

Installation of Integral Type Steel Boxed Cofferdams for Elevated Pile Caps of Donghai Bridge
SONG Chang-bing,ZHOU Xian-nian. Installation of Integral Type Steel Boxed Cofferdams for Elevated Pile Caps of Donghai Bridge[J]. Bridge Construction, 2006, 0(Z1): 66-67
Authors:SONG Chang-bing  ZHOU Xian-nian
Abstract:The construction environment of Donghai Bridge at sea is harsh and the construction safety risk there is great.At the time before the steel boxed cofferdams for the elevated pile caps of the Bridge are installed over sea,the regularities of tides,wind and sea waves should be well understood,and the construction should be accordingly organized in a reasonable way so that the time for installation of the cofferdams can effectively controlled and the construction safety risk can be reduced.
Keywords:elevated pile cap  integral type  boxed cofferdam  installation