新建兰渝铁路桃树坪隧道下穿公路设计
引用本文:徐志平.新建兰渝铁路桃树坪隧道下穿公路设计[J].国防交通工程与技术,2010,8(3):18-21.
作者姓名:徐志平
作者单位:中铁第一勘察设计院集团有限公司,陕西,西安,710043
摘    要:以新建兰渝铁路桃树坪隧道下穿公路工程为例,在保证隧道下穿工程安全施工和保持既有公路工程稳定的前提下,提出该隧道工程的设计方案和应注意的问题。通过对地表沉降的计算分析,说明本设计方案安全可行。

关 键 词:隧道  下穿  地表沉降

Design of the Taoshuping Tunnel of the Lanzhou-Chongqing Railway Under-passing the Highway
Xu Zhiping.Design of the Taoshuping Tunnel of the Lanzhou-Chongqing Railway Under-passing the Highway[J].Traffic Engineering and Technology for National Defence,2010,8(3):18-21.
Authors:Xu Zhiping
Institution:Xu Zhiping(First Survey and Design Institution Group Co.Ltd.of the Railway Ministry of China,Xi'an 710043,China)
Abstract:With the project of the Taoshuping Tunnel of the Lanzhou-Chongqing Railway under-passing the G312 National Highway as a practical example,in the paper put forward are the design scheme for the tunnel and some points for attention,which can ensure not only the safe construction of the under-passing project but also the stability of the existing highway project.The results of the calculation and analysis of the possible ground settlement prove the scheme safe and feasible.
Keywords:tunnel  under-passing  ground settlement