茶林顶公路隧道区洞口滑坡数值模拟
引用本文:罗亮,靳晓光,程崇国.茶林顶公路隧道区洞口滑坡数值模拟[J].公路交通技术,2008(6):100-102.
作者姓名:罗亮  靳晓光  程崇国
作者单位:重庆大学土木工程学院,重庆,400045;重庆交通科研设计院,重庆,400067
摘    要:隧道洞口附近覆盖较厚松散土层,进口处的隧道开挖会引起围岩应力状态变化,产生较大位移,且有可能导致其上部覆盖土层塑性区增大,出现明显的滑动面,进而产生洞口滑坡。通过对茶林预隧道进口处的隧道开挖采用三维有限元数值模拟,分析洞口滑坡的机理,并对洞口是否滑坡进行预测,为茶林顶进洞口处的安全施工提供参考。

关 键 词:隧道工程  洞口滑坡  数值模拟

Numerical Simulation for Opening Landslide in Tunnel Area on Chalinding Highway Tunnel
LUO Liang,JIN Xiaoguang,CHENG Chongguo.Numerical Simulation for Opening Landslide in Tunnel Area on Chalinding Highway Tunnel[J].Technology of Highway and Transport,2008(6):100-102.
Authors:LUO Liang  JIN Xiaoguang  CHENG Chongguo
Institution:LUO Liang1,JIN Xiaoguang1,CHENG Chongguo2
Abstract:If there is thick and loose soil covering the opening of tunnel,the excavation of tunnel at the access will cause the change of stress state of surrounding rock to produce large displacement and probably lead to the enlargement of plastic zone of its upper covering soil generating obvious sliding plane and furthermore causing the landslide of opening.With the help of three-dimensional finite element numerical simulation for tunnel excavation at the access of Chalinding Tunnel,this paper analyzes the mechani...
Keywords:tunnel project  landslide of opening  numerical simulation  