首页 | 本学科首页   官方微博 | 高级检索  
     检索      

增强长江口北槽航道内水流冲刷能力的工程措施探讨*
引用本文:刘 猛,朱 亮,李为华,胡志锋.增强长江口北槽航道内水流冲刷能力的工程措施探讨*[J].水运工程,2013(11):100-105.
作者姓名:刘 猛  朱 亮  李为华  胡志锋
作者单位:上海河口海岸科学研究中心,上海 201201;南通航运职业技术学院,江苏 南通 226010;上海河口海岸科学研究中心,上海 201201;上海河口海岸科学研究中心,上海 201201
基金项目:水利部公益性行业科研专项经费项目( 201301020) ; 上海市科学技术委员会科研计划项目 (11231202300);交通运输部科技项目(2011328A0670)
摘    要:基于试验数据对增强长江口北槽航道内水流冲刷能力进行探讨,结果表明:试图仅通过实施丁坝工程来调整北 槽中段地形使天然深泓与目前航道轴线位置吻合是行不通的;若要达到较显著的冲刷效果,新建丁坝宜布置在靠近主流的 深水区,此外在北槽中段北侧加密丁坝亦有显著作用;若想进一步增强北槽中段航道内的水流冲刷能力,宜综合采取新建 丁坝工程和航道轴线调整的措施,仅仅依靠加长丁坝,很难较好地增强该段航道内的水流冲刷能力。

关 键 词:长江口深水航道治理工程  水流冲刷能力  丁坝  航道轴线调整

Engineering measures to enhance flow erosion capability in north passage of the Yangtze estuary
LIU Meng,ZHU Liang,LI Wei-hua and HU Zhi-feng.Engineering measures to enhance flow erosion capability in north passage of the Yangtze estuary[J].Port & Waterway Engineering,2013(11):100-105.
Authors:LIU Meng  ZHU Liang  LI Wei-hua and HU Zhi-feng
Institution:Key Laboratory of Estuarine & Coastal Engineering Ministry of Transports, Shanghai Estuarine and Coastal Research Center,Shanghai 201201, China;Nantong Shipping College, Nantong 226010, China;Key Laboratory of Estuarine & Coastal Engineering Ministry of Transports, Shanghai Estuarine and Coastal Research Center,Shanghai 201201, China;Key Laboratory of Estuarine & Coastal Engineering Ministry of Transports, Shanghai Estuarine and Coastal Research Center,Shanghai 201201, China
Abstract:Based on the test data, the engineering measures to enhance the flow erosion capability in the north passage of the Yangtze estuary are discussed. The results shows that: 1) It is not feasible for attempting to adjust the topography in the middle region of the north passage to make natural thalweg location coincident with the current navigation channel axis by dike construction project only; 2)To achieve a more obvious erosion effect, the new dike should be arranged in the deep water near the mainstream, in addition, groyne encryption also plays a significant role in the north side of the north passage, middle region; 3) To further enhance the flow erosion capability in the north passage, the comprehensive measures of adjusting new groyne and navigation axis should be taken. It is difficult to better enhance the flow erosion capability in the north passage by extending groyne only.
Keywords:the Yangtze estuary deepwater channel regulation project  flow erosion capability  dike  adjustment of waterway axis
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号