首页 | 本学科首页   官方微博 | 高级检索  
     检索      

办理延续进路时对计轴自动站间闭塞电路的修改
引用本文:刘晓奇.办理延续进路时对计轴自动站间闭塞电路的修改[J].铁路通信信号工程技术,2011,8(5):64-66.
作者姓名:刘晓奇
作者单位:中铁第一勘察设计院集团有限公司,西安,710043
摘    要:喀和线马牙克站在办理向S发车口延续进路时,原有的闭塞电路不能满足技术条件,发车进路锁闭、闭塞手续自动办理影响了运输效率。对此进行分析,提出切实可行的解决办法,在实际工程中取得良好的效果。

关 键 词:延续进路  闭塞电路  修改

Circuit Modification of Automatic Block with Axle Counter as Successive Route Setting
Liu Xiaoqi.Circuit Modification of Automatic Block with Axle Counter as Successive Route Setting[J].Railway Signalling & Communication Engineering,2011,8(5):64-66.
Authors:Liu Xiaoqi
Abstract:The existing block circuit cannot meet the technical requirements when setting a successive route for a S-type departure port at Mayake station of Ka-He railway line.Consequently automatic setting of departure route locking and blocking procedure affects the operational efficiency.Through the analysis of the problem abovementioned,the paper puts forward a feasible solution which has achieved good results in the practical project.
Keywords:successive route  block circuit  modification  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号