共查询到20条相似文献,搜索用时 312 毫秒
1.
新建商合杭铁路芜湖长江公铁大桥主桥为(99.3+238+588+224+85.3)m的钢箱板桁结合梁斜拉桥,主梁上层为板桁结合,下层为钢箱结合钢桁梁。该桥钢梁划分为89个铁路面梁段单元和94个公路面梁段单元,采用分段吊装施工,钢梁架设采用"浮吊辅助架设墩顶节段+桥面架梁吊机悬臂架设"的总体方案,设中跨合龙口。首先利用浮吊起吊,采用支架法架设2号和3号桥塔墩墩顶的3个钢梁节段,然后在公路桥面上各安装2台桥面架梁吊机进行双悬臂架设,悬臂架设至辅助墩前方时,利用浮吊起吊安装辅助墩墩顶钢梁节段;当悬臂架设至边墩前方时,采用"浮吊+支架"辅助桥面架梁吊机悬臂架设边墩墩顶钢梁节段;最后利用2号墩侧架梁吊机提升中跨合龙段进行中跨合龙。 相似文献
2.
商合杭铁路芜湖长江公铁大桥主桥为主跨588m的双塔双索面高低塔箱桁组合梁斜拉桥,该桥钢主梁采用箱桁组合结构。主桥钢梁节段船运至桥位,在主墩墩旁搭设简易钢支架,采用1 000t浮吊吊装、拖拉滑移法架设主墩墩顶节段钢梁;拼装800t变幅式桅杆起重机后双悬臂架设钢梁至辅助墩;辅助墩墩顶钢梁采用800t浮吊吊装架设,桥面架梁吊机再悬臂架设钢梁至边墩,将边墩墩顶钢梁分层叠放后再依次用架梁吊机吊装就位;中跨合龙段利用无为侧架梁吊机提升,采取部分斜拉索索力调整、桥塔墩墩顶顶推纵移、温差调整等措施,实现了高精度、快速顺利合龙。 相似文献
3.
厦漳跨海大桥北汊主桥为(95+230+780+230+95)m连续半飘浮体系双塔双索面钢箱梁斜拉桥,钢箱梁架设施工前,对浮吊辅助不变幅架梁吊机安装、变幅架梁吊机安装、活动支架辅助不变幅架梁吊机安装3种方案进行比选,结合桥位处水浅、大型浮吊资源紧缺等情况,最终选定活动支架辅助不变幅架梁吊机安装为钢箱梁架设方案。施工中用塔吊拼装主塔区架设支架及单侧架梁吊机,然后架设主塔区梁段。在主塔区梁段上对称拼装另一侧架梁吊机,对称架设标准梁段,再依次架设临时墩顶梁段、标准梁段、辅助墩顶梁段、过渡墩顶梁段,最后边跨压重,架梁吊机悬拼直至完成中跨合龙段。 相似文献
4.
渝黔铁路新白沙沱长江特大桥为双层6线铁路钢桁梁斜拉桥,主桥桥跨布置为(81+162+432+162+81)m。主梁采用N形桁架,2片主桁,全桥钢梁总重约4.1万吨,共68个节间,其中重庆侧边跨4个节间钢梁跨越3条铁路线。为顺利跨越既有铁路线,重庆侧钢梁采用"部分顶推+散拼"的架设方案施工,在2号墩主跨侧的支架上一次性拼装完成,分多次请点将7.5个节间钢梁顶推过既有铁路线,剩余节间钢梁采用支架散拼法架设;贵阳侧钢梁采用双悬臂方案架设,在单侧墩旁托架上利用70t架梁吊机架设3号墩墩顶6个节间钢梁后,利用2台70t架梁吊机对称悬臂架设其余节间钢梁;主跨跨中采用适配法合龙。 相似文献
5.
厦漳跨海大桥北汊主桥为多跨连续半飘浮体系双塔双索面斜拉桥,主梁为扁平流线型封闭钢箱梁,全桥钢箱梁共划分为99节,其中墩顶区9节.经方案分析比选,选择活动支架辅助不变幅吊机架设该桥墩顶区钢箱梁.为达到支架活动变位操作简单、变形过程顺利,变形及承重状态安全,在桥塔墩顶区设置三角形活动支架,利用液压控制系统,通过上、下滑块实现支架变位;在其他墩顶区设置活动跳板梁,通过卷扬机和2套滑车组实现支架变位.为方便桥塔区架梁吊机转移,设置了1个长17m、高3.4m的架梁吊机底座.墩顶区梁段架设时,依次起吊梁段并顶推滑移到位,辅助墩及过渡墩顶梁段采用悬臂拼装方式安装. 相似文献
6.
《世界桥梁》2015,(6)
铜陵公铁两用长江大桥主桥为(90+240+630+240+90)m五跨连续钢桁梁斜拉桥,主梁采用双节间全焊桁片组拼钢桁梁结构。结合桥址处水文地理条件,对南岸边跨钢梁全顶推和双悬臂架设方案比选,确定南岸边跨采用全顶推方案。顶推施工方案为在边跨设置3处墩旁托架、2个临时墩,采用1 000t浮吊于4号墩墩旁托架主跨侧拼装30m导梁、边跨A0A5节段钢梁及架梁吊机,A6A24节段钢梁经架梁吊机起吊拼装后向边跨顶推架设。墩旁托架及临时墩立柱采用?1 400mm×22mm和?1 020mm×10mm两种规格钢管,在墩旁托架顶端设置对拉钢绞线,联结系采用?630mm×8mm和?426mm×6mm钢管;导梁采用三片桁结构,桁高和梁宽均与主梁相同;水平顶推设备为4台350t连续千斤顶,布置于4号墩墩旁托架边跨侧外立柱顶部。有限元计算及实践结果表明钢梁顶推过程中钢梁位移和应力满足要求。 相似文献
7.
大小练岛水道桥为双塔钢桁混合梁斜拉桥结构,边跨、辅助跨及主塔墩顶钢梁均采用浮吊架设,其余主跨钢梁采用架梁吊机悬臂架设。浮吊最大一吊钢梁总质量3123 t。主墩墩旁托架不仅承受钢梁自重,还需承受浮吊吊装钢梁时的冲击荷载,且海上拼装托架难度较大。通过现场试验确定钢梁落梁时冲击系数,设置对拉钢绞线抵抗钢梁竖向荷载对支架产生的水平力及台风荷载产生的水平扭矩。托架采用工厂制造成整体,再利用大型浮吊整体安装的施工技术。 相似文献
8.
银西高铁银川机场黄河特大桥采用2孔96m简支钢桁梁和2联3×168m连续钢桁梁柔性拱结构,主桁横截面采用有竖杆的三角形桁式。钢桁梁采用半悬臂法施工,其中连续钢桁梁通过70t全回转架梁吊机自中跨跨中截面开始向两边跨对称架设,中跨主桁架设后安装60t全回转架拱吊机架设中拱,2孔96m简支钢桁梁各采用1台履带吊逐节拼装。施工中,临时墩顶设置竖向千斤顶,钢梁架设至临时墩顶时可调整标高;利用70t全回转架梁吊机调整悬臂节间的标高;主墩顶设置调落梁装置,成桥后整体调落梁。该桥于2017年9月30日落梁成桥,架设过程质量安全可控,柔性拱实现了无外力自然合龙,成桥后线形良好,满足设计要求。 相似文献
9.
沪通长江大桥主航道桥为(140+462+1 092+462+140)m双塔五跨斜拉桥,主航道桥钢梁为3片N形箱桁组合结构。墩顶钢梁采用单节间或1.5节间整节段架设,最大节段重量约1 210t,吊装高度达100m。主墩、边墩、辅助墩墩顶钢梁由工厂整节段制造,驳船运至现场,采用稳强1 800t起重船对整节段钢梁进行吊装,其余节段利用架梁吊机悬臂拼装,先边跨合龙,后中跨合龙。根据有限元计算结果,墩顶钢梁架设采用有吊具的吊装方案,钢梁上焊接板件少,对钢梁受力有利。主墩墩旁托架采用外侧双管内侧单管竖直落地式支架,支架间通过交叉联结系形成稳定结构并附着于墩身,结构传力明确,制造和施工简单。边墩、辅助墩墩顶钢梁架设需要预先偏位1~2m,方便与合龙段精确调整连接。 相似文献
10.
澳氹四桥南引桥为(6×80+60) m连续变宽钢箱梁桥,钢梁为钢箱+挑臂形式,宽48.4~61.7 m。南引桥钢梁沿纵向分12个大节段,大节段钢梁分成中间钢箱和两侧翼缘,在工厂制造后运到桥位,中间钢箱利用浮吊架设成联后安装翼缘吊机进行两侧翼缘安装(S5~S7号墩间大节段除外)。由于南引桥西侧存在污水管道,S5~S7号墩超宽钢箱梁分为7个大节段制造,中间钢箱与两侧翼缘在工厂整体焊接,利用浮吊定点在S5号墩西侧起吊全断面大节段钢梁至滑移支架,由S5号墩向S7号墩方向逐节段滑移到位,最大滑移重量715 t。针对航空限高及钢梁节段重量的吊装要求,建造2 200 t L臂架起重船,非自航浮吊;制造组合吊具,以满足不同规格、不同重量的梁段吊装需求。施工时,浮吊和运梁船抛锚定位后,浮吊在高潮位取梁并携梁缓慢移位到架梁区域,分级落梁后浮吊退出,完成海上全断面超宽钢箱梁的吊装施工。 相似文献
11.
Four methods of erecting steel stiffening truss girder of suspension bridge,including the deck lifting gantry crane method,the cable-mounted crane method,the cantilever erection method with derrick crane and the incremental launching method,were studied Based on construction conditions of the bridge,according to the optimal combination of various factors such as construction safety,quality,period,environmental protection and economic performance,etc,the cantilever erection method with derrick crane was recommended for the bridge. On this basis,three categories of connection in cantilever erection methods,including the all hinged method,the successive fully splicing method and the successive splicing with temporary erection hinge method,were studied The successive splicing with temporary erection hinge method was recommended in the bridge with consideration of the requirements of construction safety,quality and time limit In addition,the traction method of hangers at the top end during cantilever erection was studied Finally,the erection method of three key
stages,including the first segment near the pylon,the standard segment,as well as the closure segment of steel stiffening truss girde,r was studied. The cantilever erection method with derrick crane provides a new way for design and construction of long-span suspension bridge with steel stiffening truss girder in the western area of China 相似文献
12.
松浦大桥主桥为两联96m+112m公铁两用钢桁架桥,上层为2车道公路,下层为单线铁路,新金山铁路建成后,对该桥进行改造,其中上层设置为双向6车道公路,需将既有12m宽桥面板更换为24.5m宽钢-混组合正交异性桥面板(单块标准段尺寸为8m×24.5m,重约100t)。受桥梁施工区域黄埔江航道、邻近铁路等因素影响,提出"水上提升站+架板机"、"浮吊+架板机"、"全浮吊"3种新桥面板吊装方案,通过比选采用"全浮吊"方案,即新桥面板采用驳船运至现场,在铁路封锁期内单侧航道间断封航,利用桥位上游侧1艘300t浮吊吊装。施工时,通过设置安全作业区(分南、北侧2个施工区域),合理地进行水上交通组织以及4种船舶锚泊布置,采用装配式固定扒杆浮吊四点起吊新桥面板,安全、快速地完成全部新桥面板更换施工。 相似文献
13.
金寨长征大桥主桥为(80+100)m斜塔斜拉桥。桥塔采用钢管混凝土组合结构,在钢管内部设置钢筋笼、钢管内壁焊接PBL纵向加劲肋及环向加劲肋,并灌注高性能混凝土,基础采用钻孔灌注桩;主梁采用钢箱结构;斜拉索呈扇形布置在中央分隔带内,单索面双排布置,斜拉索采用镀锌高强平行钢丝束,外层护套表面设置螺旋线以抑制风雨振;塔、墩、梁处钢-混结合段采用剪力钉、PBL连接键等,形成塔、墩、梁固结的约束体系。主桥采用临时墩辅助下的钢箱节段拼装方法施工。利用有限元软件对主桥进行整体结构计算,结果表明主桥的钢管混凝土桥塔、主梁、斜拉索应力均满足规范要求。 相似文献
14.
山区大跨度悬索桥钢桁梁施工技术 总被引:1,自引:0,他引:1
为解决山区大跨度悬索桥钢桁梁架设施工受地形条件限制的问题,以坝陵河大桥为背景,研究桥面吊机悬臂架设法施工中不同区域的钢桁梁安装、钢桁梁合龙及钢桁梁提升等施工技术.首、次节梁段采用整体吊装施工,标准梁段及临时铰处梁段采用桁片吊装架设,并在临时铰处设置支撑系统(与钢桁梁铰接);临时铰采用自然合龙,跨中钢桁梁合龙前调整竖向高差及上、下弦合龙口纵向相对偏差(暂不安装合龙口前端永久吊索),合龙时在桥塔处牵引钢桁梁调整纵向偏差;单点提升力大于2400 kN的梁段采用两点提升,其余梁段均采用单点提升. 相似文献
15.
深港皇岗—落马洲人行通道桥是一座独斜塔双索面斜拉桥,主梁为3层钢梁结构,底、中层为体外栓接型全焊钢箱梁,顶层为钢桁梁,各层之间通过立柱采用螺栓连接。针对底层钢箱梁的制造进行研究,通过合理划分板单元、采用高效实用的拼装定位胎模等工艺方案,摸索了体外栓接型全焊钢箱梁的制造工艺。 相似文献
16.
某铁路黄河特大桥为24×48 m上承式钢桁梁桥,建于1969年,因长期服役,梁体安全储备下降,现采用明桥面钢箱梁替换既有钢桁梁.换梁施工采用拖拉法,设置拼装支架、拖拉反力支架、跨线龙门吊等大型临时设施,分别完成钢箱梁拼装、既有钢桁梁拆除及钢箱梁提升上桥;利用PLC同步控制系统和大吨位拖拉牵引系统进行梁体单点单向整体纵向... 相似文献
17.
18.
连镇铁路五峰山长江大桥主桥为主跨1092 m的钢桁梁公铁两用悬索桥,加劲梁采用板桁结合钢桁梁结构,加劲梁恒载集度大(819.1 kN/m)。其中,一期恒载集度达501 kN/m;铁路桥面和公路桥面二期恒载集度分别为233.4 kN/m和84.7 kN/m。针对该桥特点,加劲梁采用整节段吊装,架设时采用不携带铁路二期恒载的方案施工。边跨加劲梁节段利用浮吊整体吊装至滑移支架上,再滑移至设计位置,连接成整体;中跨加劲梁节段采用2台900 t缆载吊机自跨中向两侧桥塔方向架设,节段间上弦设牛腿式临时铰进行铰接,待中跨80%节段吊装后再进行刚接;中跨加劲梁架设后,对边跨加劲梁整体姿态进行调整,通过顶、落梁与中跨加劲梁合龙,合龙后铺设铁路二期恒载。 相似文献
19.
赞比西河特大桥是赞比亚芒古-塔博桥梁项目工程的控制性重点工程,主桥为(26.6+40+3×54+40+26.6)m钢-混结合梁桥。钢梁由2根工字钢板梁组成,间距5.5 m,采用联结系连接。钢梁截面高度分别为1.6,1.6~2(变截面段),2,2~2.8(变截面段),2.8 m,宽度均为0.8 m。钢梁上部为预制混凝土桥面板,采用剪力钉连接。7跨钢梁采用“先3跨少支架法架设、后4跨大悬臂法拼装架设”的安装方法施工。钢梁施工采用千斤顶起顶过孔技术,完成钢梁上墩。钢梁节段通过施拧高强度螺栓进行栓接。钢梁安装采用MIDAS Civil软件建模计算并实施控制,保证架梁安全和钢梁线形。 相似文献