共查询到20条相似文献,搜索用时 62 毫秒
1.
长江中游界牌河段已建航道整治工程效果分析 总被引:1,自引:0,他引:1
界牌河段航道整治工程实施后,航道条件明显改善,如河段中、洪水河势得到了初步控制,航道尺度和流速、流态基本达到了设计标准。由于整治工程实施时机偏晚,工程实施后过渡段位置偏下、河道过宽,主流在鱼嘴前沿摆动空间较大,过渡段航槽不稳定,主支汊易位。在两汊转化的过程中,过渡段进口易出浅。同时,河道内螺山边滩未得到有效控制,在螺山边滩下移过程中,鱼嘴工程受强烈顶冲,其稳定受到威胁,同时鱼嘴部分功能发生了转化,由防守型变为具有一定挑流作用的整治建筑物。 相似文献
2.
3.
4.
《港工技术》2021,(4)
为达成长江口深水航道上延至南京的目标,长江南京以下12.5 m深水航道二期工程和畅洲水道实施航道整治工程,在左汊采用潜堤的结构形式,减小左汊分流比,改善右汊航道水深条件。本文根据和畅洲水道航道整治工程实施后的实测数据,与设计阶段数物模预测结果进行对比分析,综合分析工程前后在滩槽变化、河床容积、流场变化、分流分沙变化等方面的实现情况。结果表明:工程实施以后,左汊潜堤上游侧主要呈淤积状态,潜堤下游侧呈冲刷状态。右汊分流比大幅提高,河槽大面积刷深,航道维护量非常小。工程达到了预期的航道整治目标,工程治理方案合理,航道整治效果显著,可为长江中下游潮汐分汊河段航道整治提供参考。 相似文献
5.
6.
采用土工织物缝制砂袋实施航道整治工程,比传统的抛石丁坝形式具有取材方便、施工简单的特点,效益显著。本文通过分析砂袋填芯坝坝体的施工方法,研究其在航道整治工程中的应用。 相似文献
7.
8.
9.
10.
航道整治尺度的确定是航道整治工程可行性论证的重要内容之一,针对山区小流量河流,提出了水力计算法、滩情分析法、类比法,来确定合理的航道尺度。并以赤水河航道整治工程为实例进行了计算和综合分析,工程实践表明提出的计算方法是有效的。 相似文献
11.
《船舶与海洋工程学报》2014,(2)
正November 4-6,2014Moody Gardens HotelConvention Center/Galveston,TX The Deepwater Operations Conference and Exhibition is celebrating its 12th anniversary this year.This growing event will continue the tradition of excellence in addressing operational challenges involved in developing deepwater resources.We will return to the Moody Gardens Hotel and Convention Center on November 5-7,2014 in Galveston,Texas. 相似文献
12.
《船舶与海洋工程学报》2014,(1)
正19–24 October 2014 SingaporeCONFERENCE THEMES The overall aim of the ICHD Conference is to provide a forum for participants from around the world to review,discuss and present the latest developments in the broad discipline of hydrodynamics and fluid mechanics.The first International Conference on Hydrodynamics(ICHD)was initiated in 1994 in Wuxi,China.Since then,9 more ICHD conferences were held subsequently in Hong Kong,Seoul,Yokohama,Tainan,Perth,Ischia,Nantes,Shanghai and St Petersburg.Evidently the ICHD conference has become an important event among academics,researchers,engineers and operators,working in the fields closely related to the science and technology of hydrodynamics.The 11th ICHD will be held in Singapore in 2014. 相似文献
13.
Lynne Zeitlin Hale Mark Amaral Abdulrahman S. Issa B. A. J. Mwandotto 《Coastal management》2013,41(1):75-85
Site-based projects were initiated in Chawka Bay-Paje, Zanzibar, and Nyali-Bamburi-Shanzu, Kenya, to demonstrate the benefits of an integrated coastal management (ICM) approach for addressing coastal issues such as tourism development and enhancement of resource-dependent village economies in eastern Africa. A two-year, multidonor project used three primary strategies to make rapid, but sustainable, progress toward ICM. These included using interagency government teams for ICM planning, adopting an internationally recognized framework for ICM as a project ''road map,'' and explicitly incorporating capacity-building strategies into all aspects of the project. Within two years, integrated ICM action strategies, prepared through participatory processes, were being implemented at both sites, and both teams were working to expand the scale and scope of ICM in their nation. More importantly, the project helped create committed, capable, interagency groups that continue to work together to address urgent ICM issues. 相似文献
14.
This paper presents a simplified method for the reliability- and the integrity-based optimal design of engineering systems and its application to offshore mooring systems. The design of structural systems is transitioning from the conventional methods, which are based on factors of safety, to more advanced methods, which require calculation of the failure probability of the designed system for each project. Using factors of safety to account for the uncertainties in the capacity (strength) or demands can lead to systems with different reliabilities. This is because the number and arrangement of components in each system and the correlation of their responses could be different, which could affect the system reliability. The generic factors of safety that are specified at the component level do not account for such differences. Still, using factors of safety, as a measure of system safety, is preferred by many engineers because of the simplicity in their application. The aim of this paper is to provide a simplified method for design of engineering systems that directly involves the system annual failure probability as a measure of system safety, concerning system strength limit state. In this method, using results of conventional deterministic analysis, the optimality factors for an integrity-based optimal design are used instead of generic safety factors to assure the system safety. The optimality factors, which estimate the necessary change in average component capacities, are computed especially for each component and a target system annual probability of system failure using regression models that estimate the effect of short and long term extreme events on structural response. Because in practice, it is convenient to use the return period as a measure to quantify the likelihood of extreme events, the regression model in this paper is a relationship between the component demands and the annual probability density function corresponding to every return period. This method accounts for the uncertainties in the environmental loads and structural capacities, and identifies the target mean capacity of each component for maximizing its integrity and meeting the reliability requirement. In addition, because various failure modes in a structural system can lead to different consequences (including damage costs), a method is introduced to compute optimality factors for designated failure modes. By calculating the probability of system failure, this method can be used for risk-based decision-making that considers the failure costs and consequences. The proposed method can also be used on existing structures to identify the riskiest components as part of inspection and improvement planning. The proposed method is discussed and illustrated considering offshore mooring systems. However, the method is general and applicable also to other engineering systems. In the case study of this paper, the method is first used to quantify the reliability of a mooring system, then this design is revised to meet the DNV recommended annual probability of failure and for maximizing system integrity as well as for a designated failure mode in which the anchor chains are the first components to fail in the system. 相似文献
15.
16.
17.
从确定符合项目实际情况的设计原则入手,通过利比亚米苏拉塔市萨瓦瓦住宅区中心区总体布局和建筑设计两个方面的设计实践,探讨了"传统、现代与文脉"这一当今时代无法回避的文化议题。并且针对具有鲜明文化、宗教和气候特征的建筑设计的特点、方法与风格进行了总结,为今后的实践提供借鉴。 相似文献
18.
19.
介绍某码头工程3万吨级码头和5000吨级码头施工期间的沉降变位观测过程及对观测数据的分析,为类似工程提供参考。 相似文献