排序方式: 共有70条查询结果,搜索用时 15 毫秒
21.
22.
Dynamic response analysis of a multi-column tension-leg-type floating wind turbine under combined wind and wave loading 总被引:2,自引:0,他引:2
Floating wind turbines (FWTs) are subjected to combined aerodynamic and hydrodynamic loads varying both in time and amplitude. In this study, a multi-column tension-leg-type FWT (i.e., WindStar TLP system) is investigated for its global performance under normal operating conditions and when parked. The selected variables are analysed using a fully coupled aero-hydro-servo-elastic time domain simulation tool FAST. Three different loading scenarios (wind only, wave only and both combined) are examined to identify the dominant load influencing each response. The key response variables are obtained and compared with those for an NREL 5MW baseline wind turbine installed on land. The results should aid the detailed design of the WindStar TLP system. 相似文献
23.
为了进一步提升耙吸挖泥船施工效率、全面发挥耙吸挖泥船产能,以耙吸挖泥船装舱作业过程中的最大产量为优化目标、泥泵汽蚀余量和管路临界流速为约束条件,以施工人员最为熟知和方便控制的流量为优化变量,建立了耙吸挖泥船装舱作业最大产量对应流量(称为最佳流量)的计算模型,旨在面向耙吸挖泥船装舱作业拓展挖泥船施工优化理论和方法。对比分析了模型的优化计算结果和实际施工数据,吻合良好,说明模型计算结果准确可靠。另外,模型计算所需变量容易采集,优化计算结果(控制目标,流量)明确,施工人员对流量的控制操纵熟悉便捷。模型不仅能为施工设计和疏浚作业提供参考,而且易于推广应用。 相似文献
24.
25.
比较原船方案和优化方案在两种装载状态下固定起吊7500t时的数据,发现了一些问题。从而进一步分析了探讨数值分析法中所采用的优化原则的局限性。通过建立简单的数学模型,运用相关的数学软件,分析总结出压载舱分舱时的规律。比较分析几种典型的回转起吊的工况,总结出回转起吊时的一些规律。最后,归纳出如何优化设计大型起重船的压载舱。 相似文献
26.
27.
28.
29.
绞吸挖泥船的大型化可以显著加快疏浚速度,提升疏浚效率,降低环境破坏,减少人员劳动。因此,超大型化向来是疏浚业界努力追求的一个方向。上海交大船舶设计研究所设计了当前世界上最大装机功率(2.4 MW)、最大生产能力(在目标工况:排距8 km、挖深30 m、排高10 m、输送d50=0.23 mm中砂,产量大于8 000 m3/h)的绞吸挖泥船。介绍该船泥沙输送系统设计时所采用的基于目标工作点优化设计方法。该方法在前人对泥沙管道输送能耗、泥沙对泥泵性能影响等相关方面的研究成果的基础上,首次提出了针对设计工况施工效率优化,用极限工况作业能力进行校核的设计优化方法。结果表明:目标工况下,泥泵效率高达84%,柴油机效率高达90%,取得良好的节能减排和经济效果。 相似文献
30.