排序方式: 共有145条查询结果,搜索用时 250 毫秒
141.
142.
143.
基于对沿海某高速公路大桥软土地基钻孔灌注桩静载试验资料的分析,在考虑软基土层物理力学指标与桩参数互动的基础上,借助材料力学关于非线性弹性材料应力应变关系σ=Kε1n和余能公式,建立了摩擦桩桩顶轴向荷载Q与桩顶沉降S的计算模型,并将桩基工程静载实测值与计算值进行比较,证明了计算模型的可靠性和实用性。 相似文献
144.
文章基于灰色系统理论,应用其等时距GM(1,1)模型及改进的新陈代谢模型对桥梁群桩基础工后沉降进行预测,通过与蕴藻浜特大桥某墩的沉降观测资料的对比分析,提出了桥梁群桩基础工后沉降灰色理论预测方法。 相似文献
145.
Pan Y.Zheng J.Cui L. 《现代隧道技术》2018,(5):106-114
The additional pile responses due to the rheological behavior of the soil in the construction and operation periods of tunnelling are disadvantageous to the safety of the pile. However, among the current studies concerning with the rheological behavior of soft soil, the pile responses induced by the long-term settlement of 3D soil are seldom investigated. This paper mainly utilizes the finite difference software FLAC to discuss the pile response during excavation and operation periods considering rheological behavior of soft soil based on twostage analysis method. At the first stage, the displacement controlled method (DCM) is applied to simulate the short-time movement of soil during excavation period, the simulation results such as the shape of trough, pile responses such as pile deflection, settlement, axial force and bending moment are compared with the results of existing studies, and the numerical model is verified to be acceptable. At the second stage, the rheological behavior of soft soil is considered to estimate the long-term settlement of soil, the additional pile response is analyzed based on the CVISC model. Then, the influences of the four rheological mechanical parameters on the long-term soil settlement and pile responses are discussed and a fitting equation is proposed to estimate the long-term settlement of soil during the operation period. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献