首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   5篇
  免费   0篇
综合类   2篇
水路运输   3篇
  2016年   1篇
  2011年   1篇
  2009年   1篇
  2006年   1篇
  2002年   1篇
排序方式: 共有5条查询结果,搜索用时 15 毫秒
1
1.
Introduction   In recent years,due to the rapid advances ofcomputer and communication,the power suppliesmust provide high current up to hundreds of am-peres and still have high efficiency and reliability.Under such requirements,multimodule- parallelingstructure is usually used and the load current isequally shared. The practical implementation ofthese distributed converters system is not alwaysstraightforward and various control problems arisebecause of undesirable interaction among subsys-t…  相似文献   
2.
The planning, design and development of a container terminal with optimum size and capacity and with a minimum capital cost is fundamentally dependent upon the loading and discharging operations at the quayside. Achieving this purpose, terminal operators have to choose the best operating system in the container yard. The decision on which equipment is used at container terminals depends on several factors. The purpose of this study is to provide a new decision making tool using the first law of thermodynamics. It considers a port as a control volume of a fluid system and models the port and its traffic on it. The results of this study evaluate container yard operating systems and set up a basis for decision making to select the best alternatives.  相似文献   
3.
The planning, design and development of a container terminal with optimum size and capacity and with a minimum capital cost is fundamentally dependent upon the loading and discharging operations at the quayside. The quayside function of container terminals is dependent basically on the number of berths available to service the incoming container ships. The objective of the container terminals dealing and admitting the ongoing ship calls is to provide immediate berth and loading and discharging services to the container ships with a minimum costly waiting time and a maximum efficiency. Previously terminal planners used to build extra berths to provide service. During the last two decades the terminal operators have adopted automation technologies in loading and discharging operation of the container ships as an alternative to designing extra berths. Ship owners naturally expect least waiting times for their container ships. On the other hand, it is also natural for port operators in a container terminal with costly facilities to see a high berth occupancy and productivity at the quayside. This study uses queuing theory to find a break-even point as a way of evaluating the cost of container ship waiting times and the cost of berth unproductive service times for container terminals aiming to automate their quayside operation. The analysis illustrates that automation devices installed on conventional Quayside Cranes (QSCs) significantly reduce the turnaround time of the container ships calling at the ports. It argues, however, that there should be a balance between the cost of berth unproductive service times and the cost of vessel waiting times. The study introduces a break-even point to be considered as a benchmark for calculating such a balance. The analysis in this study can be used as a decision tool for the operators of container terminals in the medium to small ports to appraise the feasibility of an investment in automation or expansion of the quayside facilities.  相似文献   
4.
Consistent high-quality and defect-free production is the demand of the day. The product recall not only increases engineering and manufacturing cost but also affects the quality and the reliability of the product in the eye of users. The monitoring and improvement of a manufacturing process are the strength of statistical process control. In this article we propose a process monitoring memory-based scheme for continuous data under the assumption of normality to detect small non-random shift patterns in any manufacturing or service process.The control limits for the proposed scheme are constructed. The in-control and out-of-control average run length(AVL) expressions have been derived for the performance evaluation of the proposed scheme. Robustness to non-normality has been tested after simulation study of the run length distribution of the proposed scheme, and the comparisons with Shewhart and exponentially weighted moving average(EWMA) schemes are presented for various gamma and t-distributions. The proposed scheme is effective and attractive as it has one design parameter which differentiates it from the traditional schemes. Finally, some suggestions and recommendations are made for the future work.  相似文献   
5.
One of the most important issues that planners and developers of ports have to address at the planning process of container terminals is how to effectively optimize truck turnaround times. The time that a truck spends at a container terminal for loading and/or unloading of cargo is a real cost scenario which affects not only the smooth operation of ports but also the overall cost of the container trade. The main objective of this article is to provide a decision support tool for selecting the best container yard gantry crane for loading/discharging operation of trucks at the landside of marine container terminals. Achieving this goal, this study aims at introducing and recommending the multiple attribute decision-making and the fuzzy analytical hierarchy process models that have been proven to provide a concrete basis for such a selection decision.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号