重力式码头与板桩码头衔接技术
引用本文:刘兵强,顾新星,邵昌浩.重力式码头与板桩码头衔接技术[J].水运工程,2017(S1):98-100.
作者姓名:刘兵强  顾新星  邵昌浩
作者单位:北京水规院京华工程管理有限公司,北京 100101,北京水规院京华工程管理有限公司,北京 100101,北京水规院京华工程管理有限公司,北京 100101
摘    要:针对重力式码头与板桩码头衔接段施工穿越抛石层、后方漏砂等问题,结合两个工程实例进行研究。采取冲击钻施工工艺穿越抛石层成槽,使用高压旋喷桩加固地基、防止后方漏砂。

关 键 词:重力式码头  板桩码头  衔接  高压旋喷桩

Linkage technology of gravity wharf and sheet-pile wharf
LIU Bingqiang,GU Xinxing and SHAO Changhao.Linkage technology of gravity wharf and sheet-pile wharf[J].Port & Waterway Engineering,2017(S1):98-100.
Authors:LIU Bingqiang  GU Xinxing and SHAO Changhao
Institution:PDI Jinghua Engineering Management Co.,Ltd.,Beijing 100101,China,PDI Jinghua Engineering Management Co.,Ltd.,Beijing 100101,China and PDI Jinghua Engineering Management Co.,Ltd.,Beijing 100101,China
Abstract:Combined with 2 practical construction cases,the cutting through riprap layer and rear sand leakage of linkage construction is studied,which links gravity wharf to sheet-pile wharf. Masonry drill is used to cut through riprap layer. High pressure grouting pile is used to prevent rear sand leakage.