坝陵河大桥钢桁梁标准节段施工方案 总被引:1,自引:0,他引:1
坝陵河大桥是主跨达1 088 m的大跨径钢桁加劲梁悬索桥,采用单跨简支结构体系,其钢桁梁标准节段的桁片架设采用行走式桥面吊机进行悬臂拼装,整体梁段采用临时张拉装置进行提升安装。该桥在国内首次将桥面吊机应用于悬索桥施工。详细介绍标准节段钢桁梁的施工方案及施工过程。 相似文献
2.
为了研究山区环境下特大跨径悬索桥加劲梁架设合理的施工工艺,调研和综合分析了山区悬索桥加劲梁架设的主要方法和工艺,重点讨论了桥面吊机悬臂拼装架设法、缆索吊机架设法的施工工艺和优缺点,并从加劲梁架设工艺的经济性、施工工效、工艺成熟度、场地选择等方面作了对比分析,得到桥面吊机悬臂拼装架设法和缆索吊机架设法均适用于山区特大跨度的悬索桥,但缆索吊机架设法工效更优,运用更广泛的结论。 相似文献
3.
《桥梁建设》2015,(4)
南宁市五象大桥主桥为(45+100+300+100+45)m双塔双索面钢箱梁斜拉桥,主梁为横向分离的两全焊流线型扁平封闭钢箱梁。针对该桥钢箱梁施工难点,提出了对称悬臂拼装施工(方案1)和非对称悬臂拼装施工(方案2)2种钢箱梁施工方案,通过设备、工期及河道水位影响等方面的比选,采用方案2施工。该方案主要施工设施包括变幅式桥面吊机、边跨临时支架及顶推系统、滑移支架和桥塔墩墩旁托架及滑移系统。在边跨无水区域布置滑移支架及临时支架,安装变幅式桥面吊机,采用顶推系统后退滑移及吊机前移的方法安装边跨钢箱梁;中跨侧钢箱梁采用单侧桥面吊机悬臂拼装,利用边跨已架钢箱梁,调整索力实现非对称悬臂拼装施工。 相似文献
4.
5.
坝陵河大桥钢桁梁架设施工控制 总被引:5,自引:1,他引:4
坝陵河大桥为主跨1 088 m的单跨双铰钢桁梁悬索桥,钢桁梁采用桥面吊机由主塔向跨中进行有铰逐次刚接架设.针对施工中铰处钢桁梁线形不平顺且坡度大,吊索提升力变化较大,临时铰合龙口较多且合龙精度要求高,跨中合龙段合龙口长度偏小及上、下弦合龙口长度偏差不同等难点,对主要施工技术研究、控制后,采用调整吊机轨道坡度及观测临时铰开口量变化并及时与理论值校核的措施,关键梁段双吊点提升、加密观测临时铰合龙口并自然合龙方案,梁端牵引及合龙前端吊索暂不安装的措施,保证各工序安全、有效,实现高精度合龙. 相似文献
6.
坝陵河大桥为主跨1 088 m的单跨双铰简支钢桁梁悬索桥,钢桁梁采用桥面吊机进行有铰逐次刚接法架设,为解决临时铰数量、位置及铰部施工技术难题,采用有限元法分析不同铰数量、位置下结构内力,研究“先铰法”和“后铰法”2种临时铰形成方法、大型设备过“铰”方案和临时铰闭合方法.结果表明:提出的临时铰设置方法可较快地确定铰的数量及位置,确定的四铰设置方案能有效地减小施工过程中结构内力,整个施工过程结构内力均符合要求;结合大型设备过铰措施,先铰法的成铰方法较好地保证了结构及施工安全;通过计算预测与监测结果相校核,合理选择闭合时机,可保证临时铰的闭合精度. 相似文献
7.
新建商合杭铁路芜湖长江公铁大桥主桥为(99.3+238+588+224+85.3)m的钢箱板桁结合梁斜拉桥,主梁上层为板桁结合,下层为钢箱结合钢桁梁。该桥钢梁划分为89个铁路面梁段单元和94个公路面梁段单元,采用分段吊装施工,钢梁架设采用"浮吊辅助架设墩顶节段+桥面架梁吊机悬臂架设"的总体方案,设中跨合龙口。首先利用浮吊起吊,采用支架法架设2号和3号桥塔墩墩顶的3个钢梁节段,然后在公路桥面上各安装2台桥面架梁吊机进行双悬臂架设,悬臂架设至辅助墩前方时,利用浮吊起吊安装辅助墩墩顶钢梁节段;当悬臂架设至边墩前方时,采用"浮吊+支架"辅助桥面架梁吊机悬臂架设边墩墩顶钢梁节段;最后利用2号墩侧架梁吊机提升中跨合龙段进行中跨合龙。 相似文献
8.
连镇铁路五峰山长江大桥主桥为主跨1092 m的钢桁梁公铁两用悬索桥,加劲梁采用板桁结合钢桁梁结构,加劲梁恒载集度大(819.1 kN/m)。其中,一期恒载集度达501 kN/m;铁路桥面和公路桥面二期恒载集度分别为233.4 kN/m和84.7 kN/m。针对该桥特点,加劲梁采用整节段吊装,架设时采用不携带铁路二期恒载的方案施工。边跨加劲梁节段利用浮吊整体吊装至滑移支架上,再滑移至设计位置,连接成整体;中跨加劲梁节段采用2台900 t缆载吊机自跨中向两侧桥塔方向架设,节段间上弦设牛腿式临时铰进行铰接,待中跨80%节段吊装后再进行刚接;中跨加劲梁架设后,对边跨加劲梁整体姿态进行调整,通过顶、落梁与中跨加劲梁合龙,合龙后铺设铁路二期恒载。 相似文献
9.
商合杭铁路芜湖长江公铁大桥主桥为主跨588m的双塔双索面高低塔箱桁组合梁斜拉桥,该桥钢主梁采用箱桁组合结构。主桥钢梁节段船运至桥位,在主墩墩旁搭设简易钢支架,采用1 000t浮吊吊装、拖拉滑移法架设主墩墩顶节段钢梁;拼装800t变幅式桅杆起重机后双悬臂架设钢梁至辅助墩;辅助墩墩顶钢梁采用800t浮吊吊装架设,桥面架梁吊机再悬臂架设钢梁至边墩,将边墩墩顶钢梁分层叠放后再依次用架梁吊机吊装就位;中跨合龙段利用无为侧架梁吊机提升,采取部分斜拉索索力调整、桥塔墩墩顶顶推纵移、温差调整等措施,实现了高精度、快速顺利合龙。 相似文献
10.
坝陵河大桥主桥为主跨1 088 m的钢桁梁悬索桥,钢桁梁宽28 m,高10 m,该桥地处宽约2 000m的峡谷,桥面距谷底约370 m,两岸地势陡峭.针对其钢桁梁架设施工难度大的特点,对跨缆吊机法、桥面吊机法、缆索吊机法进行研究,并对其适用性、经济性、安全性及工期进行了综合比选.结果表明:3种施工方法的吊装速度均能满足工期要求,但缆索吊机法需占用较大的拼装场地;跨缆吊机法需改造常规跨缆吊机;桥面吊机法可较好解决施工场地及运输条件难题,施工设备投入较为经济,因此,该桥钢桁梁采用桥面吊机法施工.该方法快速、高效地完成了坝陵河大桥钢桁梁施工,实现了高精度合龙. 相似文献
11.
Four methods of erecting steel stiffening truss girder of suspension bridge,including the deck lifting gantry crane method,the cable-mounted crane method,the cantilever erection method with derrick crane and the incremental launching method,were studied Based on construction conditions of the bridge,according to the optimal combination of various factors such as construction safety,quality,period,environmental protection and economic performance,etc,the cantilever erection method with derrick crane was recommended for the bridge. On this basis,three categories of connection in cantilever erection methods,including the all hinged method,the successive fully splicing method and the successive splicing with temporary erection hinge method,were studied The successive splicing with temporary erection hinge method was recommended in the bridge with consideration of the requirements of construction safety,quality and time limit In addition,the traction method of hangers at the top end during cantilever erection was studied Finally,the erection method of three key
stages,including the first segment near the pylon,the standard segment,as well as the closure segment of steel stiffening truss girde,r was studied. The cantilever erection method with derrick crane provides a new way for design and construction of long-span suspension bridge with steel stiffening truss girder in the western area of China 相似文献
12.
U型梁为开口截面,抗扭刚度低,传统的架桥机架梁方式无法直接应用于U型梁的架设中,目前国内采用U型梁的城市如重庆、上海、南京、广州等均为吊车安装或龙门吊安装。该文针对以上问题,以轨道交通16号线U型梁架设为例,从架桥机及运梁车的设计、架桥机架梁、架桥机过孔三个方面详细介绍了U型梁架桥机架设的施工方法,开创了U型梁架桥机架设的先河,为今后类似桥梁的施工提供一定的借鉴。 相似文献
13.
南京长江第三大桥钢箱梁桥面吊机及梁段吊装工程 总被引:7,自引:0,他引:7
南京长江第三大桥钢箱梁吊装采用桥面吊机,吊装的提升、纵横坡及水平位移调整、吊机的移动等操作均通过液压系统完成,操作过程平稳、方便,可自由进行各项微调动作,安装精度高。对南京长江第三大桥桥面吊机的结构、使用和钢箱梁梁段吊装工艺和关键技术作简单介绍。 相似文献
14.
15.
上承式钢筋混凝土箱形拱桥,采用节段预制,缆索吊机安装,扣锚索悬臂架设。锚索采用岩锚形式,是利用峡谷两岸的岩体进行悬臂架设拱桥的一种新方法。 相似文献
16.
黄冈公铁两用长江大桥桥塔墩顶4个节间钢梁架设方案 总被引:5,自引:5,他引:0
黄冈公铁两用长江大桥主桥钢梁总体架设采用散拼架设方案.为解决浮吊资源问题,结合钢梁总体架设方案,通过架梁吊机和临时支架的安装及架梁吊机在此站位情况下实现墩顶节间钢梁架设的可行性研究,确定该桥塔墩顶4个节间钢梁架设方案为:先利用浮吊趁高水位时在墩旁托架上安装1个临时支架,然后在此临时支架上安装1台WD70C型架梁吊机,利用该架梁吊机完成墩顶4节间钢梁的架设工作.目前,利用该方案已完成第1个节间的钢梁架设,验证了该方案的可行性. 相似文献
17.
18.
松浦大桥主桥为两联96m+112m公铁两用钢桁架桥,上层为2车道公路,下层为单线铁路,新金山铁路建成后,对该桥进行改造,其中上层设置为双向6车道公路,需将既有12m宽桥面板更换为24.5m宽钢-混组合正交异性桥面板(单块标准段尺寸为8m×24.5m,重约100t)。受桥梁施工区域黄埔江航道、邻近铁路等因素影响,提出"水上提升站+架板机"、"浮吊+架板机"、"全浮吊"3种新桥面板吊装方案,通过比选采用"全浮吊"方案,即新桥面板采用驳船运至现场,在铁路封锁期内单侧航道间断封航,利用桥位上游侧1艘300t浮吊吊装。施工时,通过设置安全作业区(分南、北侧2个施工区域),合理地进行水上交通组织以及4种船舶锚泊布置,采用装配式固定扒杆浮吊四点起吊新桥面板,安全、快速地完成全部新桥面板更换施工。 相似文献
19.
通过对桁式组合拱桥的受力分析 ,介绍桁式组合拱桥的力学性能 ,以及它在结构和材料使用上的优点。同时简单介绍桁式组合拱桥的桁架伸臂法悬拼架设施工工艺的优越性。 相似文献
20.
基于高精度几何线形控制和大型机械化集成装备系统施工的节段预制桥梁悬拼技术,已广泛用于国内外桥梁施工。根据厄瓜多尔国家联合大桥(巴巴奥约河大桥)75 m跨径连续梁桥的工程特点,采用有限元法计算全桥预拱度,采用GeomPro软件控制与调整几何线形,介绍JP75架桥机、水上龙门吊、悬臂支架锁定、长束张拉、强制合龙及体系转换等关键设备与施工技术的研究与应用。 相似文献