共查询到20条相似文献,搜索用时 875 毫秒
1.
2.
3.
4.
5.
6.
7.
8.
针对船舶焊接建造技术精细化管理的要求,围绕现代造船模式生产实际状况,通过焊接信息定义、TRIBON M3装配计划和焊接程序二次开发及应用,实现一整套焊接智能设计技术系统。研究各类船型焊接工艺标准及规范,总结相对应的焊接规格表,建立设计编码标准和坡口标准以及标准焊接数据库;应用TRIBON M3装配计划模块,模拟分析船体分段的装配操作流程,设置合理、先进的零件流向编码体系;通过与TRIBON软件的二次开发接口,开发三维可视化焊接信息管理系统,提取三维几何模型相关信息,按照分段实际焊接制造过程,应用并统计出精确的焊缝长度、焊材消耗和焊接工时,生成焊接派工单等相关统计报表。 相似文献
9.
10.
介绍320000t VLCC船体分段制作时,利用充气密性试验方法对分段结构中水密舱壁、角焊缝及水密堵板进行密性试验的原理及方法,给出了船体分段制作过程的装配顺序、工艺要求及焊接要求. 相似文献
11.
开发一套适合船舶行业的船舶管系生产管控系统,利用信息化手段,具备原材料采购、计划管理、生产派工和报工、质量管理等功能,实现多部门多项目实时在线协同作业。该系统上线运行后,有效提高企业生产效率,降低生产成本,为推进智能制造奠定数据基础。 相似文献
12.
利用Visual C++开发工具与AutoCAD二次开发功能,实现船舶配载仪软件SafeLoad的图示配载功能。以设计单位的图纸为基础,经过简单处理,并设定舱室信息Block。程序读入船体的同时自动识别舱室范围。软件还能实现装载显示、浮态显示以及配货等功能,为用户直观全面地提供图示配载工具。 相似文献
13.
Shoji Takechi Kazuhiro Aoyama Toshiharu Nomoto 《Journal of Marine Science and Technology》2002,6(3):158-167
In ship hull production, the accuracy of management activities is extremely important. The block positioning operation in
the erection stage is a key process in such management. The quality of the block positioning determines not only the accuracy
of the final hull, but also the productivity and cost at the erection stage. We have previously proposed the basic concepts
of computer-aided accuracy management. Accuracy management activities consist of "accuracy planning activities" and "accuracy
measurement activities." Accuracy measurement activities involve checking and coping with inaccuracy. We have also proposed
a system of accuracy measurement metrics: one is accuracy for completion (e.g., straightness, flatness), and the other is
accuracy for construction (e.g., the relative joint shapes of each part). This paper explains the detailed accuracy metrics
for a block positioning operation in the erection stage. The quality of the block positioning operation is estimated by this
system: the accuracy of the completed hull can be evaluated by the concept of tolerance, and the accuracy of the construction
process can be evaluated by the concept of labor costs. The prototype of this accuracy metrics system is then implemented.
This metrics system is combined with the optimization software program iSIGHT to decide the best block positioning process.
Then some examples of the block position optimizing process are shown.
Received: November 2, 2001 / Accepted: December 6, 2001 相似文献
14.
船舶动态信息采集与传输关键技术研究 总被引:1,自引:0,他引:1
现代化智能型的船舶运输控制系统包括船舶信息管理与控制、船舶动态信息采集与传输、船队运行综合调度等三大模块。船舶动态信息采集与传输是该系统的关键部分。首先介绍船舶动态管理系统选用的软件,系统的特点和功能,并解析系统的结构。着重详尽描述船舶动态信息传输的工作原理和过程。最后介绍船舶管理信息系统及其船舶动态调度的情况。本研究成果为实施船舶的有效调度管理,为实现船岸一体化控制管理奠定基础。 相似文献
15.
16.
17.
18.
19.
20.
在某大型集装箱船建造过程中,面临与船坞坞底改造工程同期施工的特殊工况。引入双岛不移位式建造工艺,突破场地条件限制。针对双岛建造精度管理的难点,经科学策划和全过程跟踪,确保全船精度指标完全符合建造标准,实现船坞坞底改造与总段连续搭载同步进行的目标。双岛不移位式建造工艺和精度管理方法可拓展至类似船舶的船坞搭载。 相似文献